Friends of Herring River
Wellfleet and Truro, Massachusetts
Pole Dike Sub-Basin

Upper Pole Dike Sub-basin

The existing road, which currently acts as the dike, will be raised. A new larger culvert will be installed with an attached tide gate to further manage water levels separate from the main system because of the presence of sensitive development.